HomeMy WebLinkAbout2012-06-26 - AGENDA REPORTS - OVERLAY SLURRY SEAL M0084 (2)CONSENT CALENDAR
DATE:
SUBJECT:
DEPARTMENT:
Agenda Item: 5
CITY OF SANTA CLARITA
,AGENDA REPORT
City Manager Approval:
Item to be presented by
June 26, 2012
Curtis Nay
2011-12 OVERLAY AND SLURRY SEAL PROGRAM, PROJECT
M0084 - AWARD CONSTRUCTION CONTRACT
Public Works
RECOMMENDED ACTION
1. City Council approve the plans and specifications for the 2011-12 Overlay and Slurry Seal
Program, Project M0084.
Award the construction contract to All American Asphalt in the amount of $5,995,000, and
authorize a contingency in the amount of $599,500, for a total contract amount not to exceed
$6,594,500.
3. Award professional services contract to Pavement Engineering, Inc., in the amount of
$65,000, for pavement inspections and updates for the Pavement Management System.
4. Award professional services contract to BTC Labs -Vertical Five in the amount of $372,000
for project inspection and materials testing.
5. Authorize an expenditure increase not to exceed $50,000, to the existing professional
services contract with Pavement Engineering, Inc., for design and construction support
services.
6. Authorize the transfer of $365,000 from the 2010-11 Federal Overlay Program Account
M0083233-5161.001 to the 2011-12 Overlay and Slurry Seal Program Account
M0084233-5161.001.
Increase Expenditure Account M0077233-5161.001 by $212,000 and decrease Expenditure
Account M0077230-5161.001 by $212,000.
8. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
nn
ir�y`�I1�tJzr,�3f i
Lt�li UJJ LU
BACKGROUND
The Annual Overlay and Slurry Seal Program project is an integral part of the City's pavement
management program. Each year, streets are evaluated and identified for their need of
rehabilitation or maintenance treatments. The 2011-12 project will provide asphalt overlay and
slurry seal treatments in various areas of the City (see attached project streets list). These
treatments will provide a smoother ride for traffic and enhance the appearance of the roadway
and surrounding area. This year's project is scheduled to begin construction in July and be
completed by the end of November 2012.
An invitation to bid was published three times (April 25, April 29, and May 2, 2012) and posted
to the City's website. Plans and specifications were also sent to area plan rooms. Seven bids were
submitted to the City and opened by Purchasing on May 21, 2012. The results of the bids are
shown below:
Company
All American Asphalt
Toro Enterprises, Inc.
Palp, Inc., DBA Excel Paving Company
Sully -Miller Contracting Company
C.A. Rasmussen, Inc.
Silvia Construction, Inc.
Granite Construction Co.
Location Bid Amount
Corona, CA
$
5,995,000.00
Oxnard, CA
$
6,097,175.84
Long Beach, CA
$
6,243,333.00
Brea, CA
$
6,250,270.00
Valencia, CA
$
6,276,400.60
Rancho Cucamonga, CA
$
6,277,688.89
Watsonville, CA
$
6,995,228.40
The basis for awarding this project is the base bid plus the alternates. The City reserves the right
to award the base bid and any of the alternates at the City's discretion. The bid results shown
above include all of the Additive Alternates (1 through 8). Staff recommends awarding the base
bid and additive alternates 1 through 8. Upon review of the bids, staff recommends awarding the
construction contract to the lowest responsive bidder, All American Asphalt, which possesses a
state contractor's license and is in good standing with the Contractors State License Board. The
bid from All American Asphalt was reviewed for accuracy and conformance to the contract
documents and found to be complete.
To ensure efficient and proper procedures in construction and materials testing, costs for
construction inspection and materials testing services were anticipated and identified in the
original budget. A request for proposal was sent to several consultants. Upon reviewing the
consultants' proposals, staff recommends awarding the construction management and materials
testing services contract to BTC Labs -Vertical Five in an amount not to exceed $372,000. BTC
Labs -Vertical Five has worked well with the City on past projects and has demonstrated
competent and timely services.
While the City maintains a "Support of Local Businesses" policy that can be utilized by the City
Council when warranted, the City is governed by the State Public Contract Code with regard to
public works project procurement. In these types of procurements, the State Public Contract
Code does not permit a city to utilize a "Support of Local Businesses" policy and instead requires
G
the contract be awarded to the "lowest responsible bidder." As confirmed by the City Attorney's
Office, this direction precludes the City from applying any superseding criteria for award except
in the case of a tie. Thus, in awarding public works contracts, the City is not permitted to award
to the second lowest bidder just because they are local, as the State Public Contract Code does
not allow the City to recognize them as the "lowest responsible bidder."
Last year's paving project, 2010-11 Federal Overlay Program, Project M0083, has $365,000 in
savings that is recommended to be transferred to this year's project. Also, staff is seeking
authorization of an expenditure increase not to exceed $50,000, for design services to the existing
professional services contract with Pavement Engineering, Inc., for design and construction
support services. Additionally, staff is recommending a funding swap of $212,000 in Gas Tax
Funds currently budgeted in the 2010-11 Overlay and Slurry Seal Program, Project M0077, with
Transportation Development Act Article 8 Funds in the amount of $212,000, to maximize the
use of available Transportation Development Act funding.
As part of the annual street maintenance project, the City also inspects and records pavement
conditions citywide. Staff is seeking authorization of $65,000 for Pavement Engineering, Inc., for
pavement inspections and updates to the City's Pavement Management System. The City is
responsible for the maintenance of 999 lane miles.
Adequate funds have been appropriated for construction management, survey, labor compliance,
staff oversight, and project administration costs, as well as a future federally funded overlay
project.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
The budget for the 2011-12 Overlay and Slurry Seal Program, Project M0084, is $7,750,000. The
recommended actions will make available a budget of $8,115,000 for the 2011-12 Overlay and
Slurry Seal Program to adequately provide for all anticipated construction and project
management costs, and for a future federally funded overlay program, the 2011-12 Federal
Overlay Program.
ATTACHMENTS
Streets List
City of Santa Clarita
2011-12 Overlay and Slurry Seal Program, Project M0084
Street List
Base Bid Arterials
Citywide
To
Street Name
From
To
Fanchon Ln
Rainbow Glen Dr
Flo Ln
Golden Triangle
Isabella Parkway
Rainbow Glen Dr
Golden Valley Parkway
Digouts various locations
Ada St
Intersection
McBean Parkway
Valencia Blvd
McBean Parkway
Valencia Blvd
Del Monte
Newhall Ave
Digouts various locations
North End
Soledad Canyon Rd
W. of Prairie Ln
Poppy Meadow St
Valencia Blvd
McBean Parkway
Citrus St
Base Bid Neighborhood C4
Canyon Country
Street Name
From
To
Cedarcreek St
Honby Ave
East to Conform
Honby Ave
Soledad Canyon Rd
North End
Soledad St
Honby Ave
Furnivall Ave
Base Bid Neighborhood C11
Canyon Country
Street Name
From
To
Bainbury St
Winterdale Dr
Lakecrest Ave
Gailxy Ave
Soledad Canyon Rd
Bainbury St
La Veda Ave
Bainbury St
West End
Lakecrest Ave
Bainbury St
Goodvale Rd
Base Bid Neighborhood C12
Street Name
From
To
Ada St
Oak Spring Canyon Rd
Sam PI
Ada St
Marilyn Dr
Rue Daniel
Cindy Ct
Sam PI
North End
Loretta Ln
Rosehaven Ln
Ada St
Marilyn Dr
Rosehaven Ln
Meadow Dr
Rosehaven Ln
Loretta Ln
East End
Rue Daniel
Ada St
North End
Rue Entrde
Soledad Canyon Rd
Rosehaven Ln
Sam Place
Ada St
North End
IN■
Base Bid Neighborhood C25
Canyon Country
Street Name
From
To
Cedar Valley Way
Sierra Estate Dr
Highway 14 Bridge
Hillsfall Ct
Cedar Valley Way
North End
Kalb Ct
Cedar Valley Way
North End
Kandi Ct
Cedar Valley Way
North End
Mountain Dale Ct
Ridge Vale Dr
West End
Pad Ct
Cedar Valley Way
South End
Ridge Vale Dr
North End
South End
Base Bid Neighborhood N3
Newhall
Street Name
From
To
Oakridge Dr
Via Princessa
Railroad Ave
Flower Fields Ave
Rolling Greens Way
Heather Vale St
Heather Vale St
Flower Fields Ave
South End
Little Cedar Way
Oakridge Drive
East End
Oakridge Dr
Via Princessa
White Wing Way
Red Bluff Ct
Rolling Greens Way
West End
Rolling Greens Way
Via Princessa
South End
Vasquez Rock Ct
Oakridge Dr
East End
Via Princessa (WB)
Claibourne Ln
Bridge Deck
Via Princessa (EB)
Bridge Deck
East End
White Wing Way
Heather Vale St
East End
Wood Dale Ct
Little Cedar Way
South End
5
Base Bid Neighborhood N10
Newhall
Street Name
From
To
Airville Ave
Cherry St
South End
Arlen Or
Apple St
West End
Heather Knolls PI
Apple St
West End
Highland Glen Or
Apple St
West End
Highspring Ave
Rosepark Ct
North End ,
Lloyd Houghton PI
Apple St
West End
Peachland Ave
Lyons Ave
Rosepark Ct
Base Bid Neighborhood S8
Saugus
Street Name
From
To
Caitlin Ln
Timothy Or
West End
Maroge Circle
Timothy Or
Nicholas Circle
Myrtle Wy
Rodgers Or
Samual Or
Nickie Ln
Timothy Or
West End
Rodgers Or
Plum Canyon Rd
Adriene Way
Romar Ln
Rodgers Or
West End
Samual Or
West End
East End
Timothy Or
Rodgers Or
North End
Base Bid Neighborhood V18S and V23S
Valencia
Street Name
From
To
Alta Madera Or
Avenida Navarre
Avenida Velarte
Via Dabna
Via Valer
Avenida Navarre
Via Delicia
Avenida Navarre
Via Dabna
Via Valer
Via Dabna
Via Nautica
Via Nautica
Avenida Velarte
South End
[,J
Add Alternates
Alt 1 - Neighborhood N4
Newhall
Street Name
From
To
Claibourne Ln
Via Princessa
West End
Stratford Dr
Claibourne Ln
Oxford Ln
Alt 2 - Neighborhood N8
Newhall
Street Name
From
To
Avenida Dorena
La Glorita Circle
Lyons Ave
La Glorita Circle
Markel Dr
Wiley Canyon Rd
Markel Dr
Cheryl Kelton PI
North End
Alt 3 - Neighborhood S9
Saugus
Street Name
From
To
Arriba Dr
Seco Canyon Rd
East End
Chaparro Dr
Seco Canyon Rd
Decoro Dr
Decoro Dr
Seco Canyon Rd
Chaparro Or
Garzota Dr
Seco Canyon Rd
Barbacoa Dr
Santa Clarita Rd
Arriba Dr
Chaparro Dr
Alt 4 - Neighborhood C20
Canyon Country
Street Name
From
To
Ironstone Dr
Nugget Dr
Soledad Canyon Rd
Nugget Dr
River Circle
West End
River Circle
Soledad Canyon Rd
Soledad Canyon Rd
Alt 5 - Neighborhood V26S
Valencia
Street Name
From
To
Vista Hills Dr
Cariz Dr
Farrow Dr
Vista Ridge Or
Farrow Dr
Wiley Canyon Rd
7
Alt 6 - Neighborhood S8 Slurry
Saugus
Street Name
From
To
Balta Dr
Lisa Gail Dr
Jay Carroll Dr
Bena Ct
Lisa Gail Dr
South End
Charles Dr
Satinwood Dr
South End
Ebb Ct
Jay Carroll Dr
South End
Ellis Ct
Satinwood Dr
South End
Helton Dr
Satinwood Dr
Marshall Way
Jay Carroll Dr
East End
West End
Jay Carroll Dr
Ebb Ct
Rodgers Dr
Laplante Way
Lisa Gail Dr
South End
Lisa Gail Dr
Charles Dr
Jay Carroll Dr
Marshall Way
Susan Carole Dr
East End
Radfall Ct
Susan Carole Dr
South End
Satinwood Dr
Wellston Dr
Charles Dr
Susan Carole Dr
Radfall Ct
South End
Vernal Way
Lisa Gail Dr
South End
Wellston Dr
Susan Carole Dr
Bouquet Canyon Rd
Alt 7 - Neighborhood C14 (Shadow Pines)
Canyon Country
Street Name
From
To
Shadow Pines Blvd
Soledad Canyon Rd
Begonias Ln
Alt 8 - Soledad Canyon Road
Canyon Country
Street Name
From
To
Soledad Canyon Road
W. of Prairie Ln
Sand Canyon Rd
on