HomeMy WebLinkAbout2013-06-11 - AGENDA REPORTS - AMEND NLF INFRAST REIMB AGMT (2)CONSENT CALENDAR
DATE:
SUBJECT:
DEPARTMENT
Agenda Item: 10
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval:
Item to be presented by:
June 11, 2013
i.
Kevin Tonoian
AMENDMENT OF INFRASTRUCTURE REIMBURSEMENT
AGREEMENT
Administrative Services
RECOMMENDED ACTION
City Council:
Amend an Infrastructure Reimbursement Agreement with Newhall Land, and authorize
additional expenditures in the amount of $150,777, plus a 20 percent contingency on the
landscape improvements, design, and utilities of $29,277, for a total not to exceed the amount
of $180,054 for the installation of landscape and irrigation median improvements.
2. Appropriate funds in the amount of $180,054 from Landscape Maintenance District Fund
(357) Balance to Account 12541-5161.013.
3. Authorize the City Manager or designee to execute this Agreement, subject to City Attorney
approval.
BACKGROUND
At their April 9, 2013 regular meeting, the City Council approved a Reimbursement Agreement
with Newhall Land (Developer) to construct supplemental median improvements on behalf of the
City adjacent to, but not required as a condition of the Villa Metro Project. These roadway
improvements encompass a blended combination of median work the City conditioned and
supplemental work requested by the City. The work previously authorized by the City Council
was requested by the City to ensure consistency throughout the roadway corridor and is under
construction.
At this time, staff is returning to the City Council with a request to amend the original
Reimbursement Agreement in order to authorize the Developer to complete the installation of
APPROVED - � -
landscape and irrigation -related improvements on the City's behalf. This work would be located
within portions of two median islands on Soledad Canyon Road where the Developer recently
completed raised median curbing. The location of these medians are directly adjacent to the
Metrolink Station and Saugus Speedway (see Exhibit "G") outside the project boundaries area
and are not subject to the original conditions of approval.
As part of the Villa Metro Project and at the Developer's cost, the City required installation of
median landscaping along Soledad Canyon Road beginning just east of the Metrolink Station and
extending to the Cross Valley Connector Flyover. Piggy -backing off the Developer's pending
landscape work through this amended reimbursement agreement will allow the City to take
advantage of economies of scale pricing and expedite construction of the final segment of
landscaping needed along Soledad Canyon.
Costs associated with the installation of the landscape improvements are estimated to be
$180,054. The breakout of this work encompasses $94,253 for landscape improvements,
$56,524 for design, project management, water connection, and meter -related costs, and a 20
percent contingency of $29,277.
Consistent with the previous Infrastructure Reimbursement Agreement approved by the City
Council, the supplemental landscape work requested by the City and subject of this proposed
amendment was competitively bid as a prevailing wage project. The Developer has submitted
the attached documentation to the City evidencing the costs of the improvements. Special
Districts staff has reviewed and determined the costs to be reasonable and appropriate.
Pursuant to the amended agreement, the City would reimburse Newhall Land an amount not to
exceed $180,054 for the landscape improvements. Pending approval of this agreement, the
developer is ready to proceed with the construction and installation of the improvements.
ALTERNATIVE ACTIONS
1. Do not approve the Reimbursement Amendment.
2. Other action as determined by the City Council.
FISCAL IMPACT
Appropriate funds in the amount of $180,054 from Landscape Maintenance District Fund (357)
Balance to Account 12541-5161.013. Adequate monies are available in Fund 357 to complete
these proposed landscape median improvements.
ATTACHMENTS
Contract 13-00139 Amendment A
Exhibit E - Exclusions and Clarifications
Exhibit F - Schedule of Prices
Exhibit G - Project Area Maps
-z
FIRST AMENDMENT TO
AGREEMENT NO. 13-00139 BETWEEN
THE CITY OF SANTA CLARITA AND
NEWHALL LAND
Contract No. 13-00139A
THIS FIRST AMENDMENT ("Amendment") is made and entered into this day of
20_ by and between the CITY OF SANTA CLARITA, a general law city and municipal
corporation existing under the laws of California ("CITY"), and Newhall Land ("DEVELOPER").
1. Pursuant to Section 4 (Reimbursement) of Agreement No. 13-00139 ("Agreement"),
amendment to Section 4 to read as follows:
The total Reimbursement Costs may not exceed $559,582 (the "Projected Cost Cap"),
provided that the Reimbursement Costs may exceed the Projected Cost Cap, and City agrees to
reimburse Developer for Reimbursement Costs that exceed the Projected Cost Cap, as generally
described on Exhibits E & F attached hereto. However, in the event Developer determines the
Reimbursement Cost will exceed the Projected Project Cap for Supplement Improvements as
described in Exhibits E & F (an "Excess Costs Determination"), prior to submitting a remittance for
such excess costs, Developer will seek formal City Council approval. If Developer makes an
Excess Costs Determination, Developer may discontinue all work on the Supplemental
Improvements until such time that the City Council approves payment of such excess costs and any
delay associated therewith shall be deemed to be an Unavoidable Delay. If the City Council does
not approve such excess costs, Developer may complete the portion of the Supplemental
Improvements Developer reasonably determines are not impacted by such excess costs, in whichr
case Developer shall be relieved of the obligation to complete such impacted portions of work and
the City shall reimburse Developer for all other Reimbursement Costs. Developer agrees to keep
full and accurate books of account and records of such Reimbursement Costs for the term of this
Agreement and to make them available to City upon request. Any portion of the Reimbursement
Costs not paid to Developer when due hereunder shall accrue interest at ten percent (10%) per
annum.
2. This Amendment may be executed in any number or counterparts, each of which will be an
original, but all of which together constitutes one instrument executed on the same date.
3. Except as modified by this Amendment, all other terms and conditions of Agreement No. 13-
00139 remain the same.
[SIGNATURES ON NEXT PAGE]
7/2006
-3-
IN WITNESS WHEREOF the parties hereto have executed this contract the day and year
first hereinabove written.
FOR DEVELOPER:
Print Name & Title
FOR CITY OF SANTA CLARITA:
KENNETH STRIPLIN, CITY MANAGER
Un
City Manager
Date:
ATTEST:
By:
City Clerk
APPROVED AS TO FORM:
JOESPH M. MONTES, CITY ATTORNEY
M
City Attorney
7/2006
-y
EXHIBIT E
EXCLUSIONS AND CLARIFICATIONS
EXCLUSIONS (see footnote 1 below):
1) Permits
2) Dirt removal if soil is deemed contaminated
3) Soil amendments beyond what is customary with -in the industry
4) Any City requested revisions or additions that are not reflected on the landscape plans
prepared by Pacific Coast Land Design, INC., dated 2013, which were
approved by the City on 2013
CLARIFICATIONS FOR REIMBURSEMENT:
"Schedule of Prices"
1) The attached "Schedule of Prices" is based on the information available and is an
estimate only and not a guaranty or warranty by Developer. Among other things,
quantities may change and/or unforeseen circumstances may occur (such, for example,
as additional costs associated with water connection -related fees) which will cause
additional Reimbursement Costs to be incurred and payable by the City to Developer.
2) All quantities are to be field verified by both a Developer and City representative.
Developer will be paid according to the unit pricing in the Schedule of Properties and
final quantities.
3) All work is to be performed during the normal day time hours. Night work will be an
additional cost.
4) The estimated costs anticipate that work will be authorized by the City and that
Developer's subcontractors will be able to work continuously and without interruption.
Any delays (whether or not caused by the City) will cause additional costs to be incurred.
Footnote
1. If any items described in the exclusions become part of the scope of work, the actual costs
incurred shall be included in the Reimbursement Costs.
—5—
EXHIBIT F
American Landscape
SIZE
SIZE
UNIT
ITEM MATERIA
DESCRIPTION
UNIT
UWNER
Quantity
SUB.
CONTRACTO
RQuantity
TOTAL COST
WITH YOUR
UNITPRICE QTYS
MOBILIZATION -Initial
LS
1
1
$250.00 $250.00
Additional mobilization
EA
1
1
$250.00 Total $-N/A At
This Time
Additional mobilization - concrete
1
$1,500.00 Total$ -N/A At
This Time
TRAFFIC CONTROL
LS
1
1
$3,750.00 $3,750.00
SITE PREPARATION
LS
1
1
$3,041.40 $3,041.40
Site Preparation -Flat Grountl
SF
6,800
$0.195 Total in LS
Site Preparation - Slopes
SF
$
Total in LS
Fine Grade - Flat Ground
SF
Induced in Item
3.1
Total in LS
Fine Grade - Slopes
SF
$
Total in LS
Soil Tests
EA
3
$123.00 Total in LS
Mulch - Flat Ground
SF
6,800
$0.198 Total in LS
Mulch - Slopes
SF
$
Total in LS
Turf - Sodded
SF
$
Total in LS
Turf -Seeded
SF
$
Total in LS
Bend -a -Board
LF
$
Total in LS
Jute Mesh Fire
Resistant
SF
$
Total in LS
IRRIGATION SYSTEM
LS
1
1
$34,547.00 $34,547.00
Irrigation System - Flat Ground
SF
6,800
$5.080 Total in LS
Irrigation System - Slopes
SF
$
Total in LS
GROW and KILL
LS
1
1
$0.00 $0.00
Grow and Kill -Flat Ground
SF
N/A
N/A
$0.00 Total in LS
Grow and Kill - Slopes
SF
N/A
N/A
$0.00 Total in LS
INSTALL TREES
LS
1
1
$13,595.18 $13,595.18
1
GA
Trees
FA
$
Total in LS
5
GA
Trees
Fit
$
Total in LS
15
GA
Trees
FA
$
Total in LS
24
IN
Trees
Box
EA
21
$230.50 Total in LS
36
IN
Trees
Box
EA
$
Total in LS
48
IN
ITrees
Box
FA
$
Total in LS
60
IN
Trees
Box
EA
$
Total in LS
72
IN
Trees
Box
EA
$
Total in LS
84
IN
Trees
Box
EA
$
Total in LS
Cast Iron Tree Grates
(Frames Installed by
Concrete Contractor)
EA
$
Total in LS
�Root/Moistum Barrier
EA
1,337
$6.548 Total in LS
INSTALL SHRUBS
LS
1
1
$7,171.90 $7,171.90
1
GA
Shrubs
EA
184
$6.40 Total in LS
5
GA
Shrubs
EA
377
$15.90 Total in LS
15
GA
Shrubs
EA
It
Total in LS
24
IN
Shrubs
Box
EA
$
Total in LS
36
IN
Shrubs
Box
EA
$
Total in LS
5
GA
Vines
EA
$
Total in LS
15
GA
Vines
EA
$
Total in LS
24
IN
Vines
Box
EA
$
Total in LS
INSTALL GROUND COVER PLANTING
LS
1
1
$
$
Ground Cover -Flat Grountl
SF
$
Total in LS
Ground Cover- Slopes
SF
$
Total in LS
INSTALL HYDROSEED
LS
1
1
$
$
Hydroseed -Flat Ground
SF
$
Total in LS
Hytlroseetl -Slopes
SF
$
Total in LS
LANDSCAPE MAINTENANCE
90 Day
LS
1
1
$897.60 $897.60
30 -day
I
SF
N/A
N/A
$0.00 Total in LS
90 -day
SF
6,800
$0.132 Total in LS
270 -day
SF
N/A
N/A
$0.00 Total in LS
SUB TOTAL
$63,253.08
TOTAL- LANDSCAPE IMPROVEMENTS (Speedway)
$63,253.08
-6—
American Landscape
SIZE
SIZE
UNIT
ITEM
MATERIAL DESCRIPTION
UNIT
OWNER
Quantity
SUB-
CONTRACTO
R Quantity
TOTAL COST
WITH YOUR
UNIT PRICE OTYS
MOBILIZATION -Initial
LS
1
1
$250.001 $250.00
Additional mobilization
EA
1
1
$250.00 Total $-N/A At
This Time
Additional mobilization - concrete
1
$1,500.00 Total$ -N/A At
This Time
TRAFFIC CONTROL
LS
1
1
$3,750.00 $3,750.00
SITE PREPARATION
LS
1
1
$2,132.78 $2,132.78
Site Preparation - Flat Grountl
SF
4,488
$0.195 Total in LS
Site Preparation -Slopes
SF
Total in LS
Fine - Flal Ground
SF
Included in Item
3.1
Total in LS
raGrade
Fine Gde - Slopes
SF
$
Total in LS
Soil Tests
EA
3
$123.00 Total in LS
Mulch - Flat Ground
SF
4,488
$0.198 Total in LS
Mulch - Slopes
SF
$
Total in Ls
Turf - Sodded
SF
$
Total in LS
Turi- Seeded
SF
$
Total in LS
Bend -a -Board
LF
Total in LS
Plastic Header Oly Ola Edge King
(Jute Mesh
Fire
Resistant
SF
0
Total in LS
IRRIGATION SYSTEM
LS
1
1
$12,523.96 $12,523.96
Irrigation System - Flat Grountl
SF
4,488
$2.791 Total in LS
Irrigation System -Slopes
SF
Total in LS
GROW and KILL
LS
1
1
$0.00 $0.00
Grow and Kill - Flat Ground
SF
N/A
N/A
$0.00 Total in LS
Grow and Kill - Slopes
SF
N/A
N/A
$0.00 Total in LS
INSTALL TREES
LS
1
1
$7,301.12 $7,301.12
1
GA
Trees
EA
$
Total in LS
5
GA
Trees
EA
$
Total in LS
15
GA
Trees
EA
$
Total in LS
24
IN
Trees
Box
EA
10
$230.50 Total in LS
36
IN
ITrees
Box
EA
$
Total in LS
48
IN
Trees
Box
EA
$
Total in LS
60
IN
ITrees
Box
EA
$
Total in LS
72
IN
Trees
Box
EA
$
Total in LS
84
IN
Trees
Box
EA
$
Total in LS
Cast Iron Tree Grates
(Frames Installed by I
Concrete Contractor)
EP.
$
Total in LS
Root/Moisture Barrier
EA
763
$6.55 Total in LS
INSTALL SHRUBS
LS
1
1
$4,449.501 $4,449.50
1
GA
Shrubs
EA
176
$6.40 Total in LS
5
GA
Shrubs
EA
209
$15.90 Total in LS
15
GA
Shrubs
EA
$
Total in LS
24
IN
Shrubs
Box
EA
$
Total in LS
36
IN
Shrubs
Box
EA
$
Total in LS
5
GA
Vines
EA
$
Total in LS
15
GA
Nines
EA
$
Total in LS
24
IN
Vines
Box
EA
$
Total in LS
JINSTALL GROUND COVER PLANTING
LS
1
1
$
$
Ground Cover - Flat Ground
SF
$
Total in LS
Ground Cover - Slopes
SF
$
Total in LS
INSTALL HYDROSEED
LS
1
1
$0.00
Hydroseed - Flat Ground
SF
Total in LS
lHydroseed - Slopes
SF
$
Total in LS
LANDSCAPE MAINTENANCE
90 Day
LS
1
1
$592.42 $592.42
�30-day
SF
N/A
N/A
$0.00 Total in LS
90-tlay
SF
4,486
$0.132 Total in LS
270 -day
SF
N/A
N/A
$0.00 Total in LS
TOTAL. LANDSCAPE IMPROVEMENTS (Metrolink Station)
$30,999.78
SUBTOTAL - LANDSCAPE IMPROVEMENTS (Speedway) $63253.08
SUB TOTAL - LANDSCAPE IMPROVEMENTS ( Metrolink Station) $30,999.78
GRAND TOTAL - PANELA SUB -TOTAL LANDSCAPE $94,252.86
APPROVED LANDSCAPE PLANS
$
20,170.00
ADD WATER METER AT SPEED WAY
$
18 000.00
CASTAIC LAKE WATER FEES
$
4,694.00
ELECTRICAL PEDISTAL (T&D Electric)
$
9,268.00
EDISON
SUB -TOTAL SUPORT TRADES $
52,132.00
Management fee 3%
$4,391.55
Contingency 20%
$29,276.97
Grand Total Complete $180,053.38
X
1
Z
�Q s
Jg� o
v
3
/bllb �C9 O
N
7
W�SNBpNE d N
7 3NOBHSM SUMMIT Q C
Ea E
3 moo
C7 >
pprKEFeu j N n
O E
DpJEWEED O OpgDO O N
U
- OOgN O
�PpO O N
JN
Gp > _T
J
G
O
8
�y OIJ.DOINO
S �
O
Z
U
Z
LL ��
sHaoMsaiA
O
u � b1id. OOpyO
•�/^� Z j
Vi G
Z
ya
Q a
i� SpU�e
U vy
U) einos u
70
1 O
C6 �
CIOp
C �D
G y
«
0
%
0
\
0
CO
g
m
E
§
G
«
g
/
_
\
E
of
/
.a
/
■
S
\
§