HomeMy WebLinkAbout2014-03-25 - AGENDA REPORTS - REGIONAL WATER MGMT PLAN (12)Upper Santa Clara River IRWMP
November 15,2011 2 pm
Prop 84 IRWMP Updates
Address Statewide Priorities
Meet New I RWM Plan Standards (16)
a a a
$6.9M implementation grant is contingent upon
update of the planl
0 0
Statewide Priorities
New Technical Studies
Climate Change Technical Study
Adaptation to Climate Change Effects
Mitigation of Greenhouse Gas (GHG) Emissions
Salt and Nutrient Management Plan
Surface and Groundwater Quality Protection
As required by the State Water Resources Control
Board's RecycledWater Policy
0
Plan Standards Overview
Governance (New RWMG
Standard)
Region Description
Objectives
Resource Management
Strategies
Integration
Project Review Process
(NEW)
Impact and Benefit
Plan Performance and
Monitoring
Data Management
Finance
Technical Analysis
Relation to Local Water
Planning (NEW)
Relation to Local Land
Use Planning
Stakeholder Involvement
• Coordination
• Climate Change (NEW)
Updates
a
Integration
Continue to use successful framework
Governance
Update with narrative from
(RAP) application
Stakeholder Involvement
Region Acceptance Process
Update with RAP and meetings undertaken as part of
IRWMP Update
Coordination
Update with RAP
California Climate Adaptation Strategy
Membership in CA Climate Action Registry
City of Santa Clarita's Climate Sensitivity Study
Updates
Region Description
RAP update
Ongoing efforts
New land use map per One Valley, One Vision
Climate change technical study
Impact and Benefit
Within IRWM region and between regions
DACs, Ej, Native American tribal communities
Updates
Finance
O&M costs
Updated list of funding sources and mechanisms
Technical Analysis
Update with revised technical resources
Climate change technical study
Selection of water management strategies
Updates
Plan Performance and Monitoring
Data management System (DMS)
Track and document implementation progress
Store and disseminate monitoring data
Findings and "lessons learned"
Policies and procedures for adaptive management
Data Management
DMS for data integration into State databases
RWMG document review process
Data sharing
Updates
Objectives
Measurement and prioritization
Adaptation to climate change impacts
Update water quality improvement objective with
Salt and Nutrient Management Plan
Resources Management Strategies
CaliforniaWater Plan Update 2009 strategies
"NomRegrets" adaptation strategies
Updates
Relation to Local Water Planning
Standard met by existing Plan
Strategies from local plans to address climate change
standard
Relation to Local Land Use Planning
Standard met by existing Plan
Information sharing and collaboration with land use
planning efforts to address climate change standard
Updates
Project Review Process (NEW)
RAP update
Contribution to climate change adaptation
Contribution to GHG emission reductions
GHG emissions CEQA analysis
Climate Change Standard (NEW)
Adaptation responses to climate change effects
0 0
Mitigation of GHG emissions
Technical Study
Climate Change Technical Study
Identify Vulnerability to Climate Change
Influences Region Description, Objectives, Relation
to Local Water Planning, Relation to Local Land Use
Planning, and Project Review Process of IRWMP
Update
Identify Adaptation Strategies
Influences Objectives, Relation to Local Water
Planning, Relation to Local Land Use Planning and
Project Review Process of IRWMP Update
Recommendations on Data Collection/Next
Steps for Climate Change in IRWMP Updates
Salt and Nutrient Management Plan
Prepare Salt and Nutrient Management Plan
for submittal to RWQCB
Influences Objectives, Plan Performance and
Monitoring, and may result in new projects for
consideration in IRWMP
Salt and Nutrient Management Plan
SWRCB Recycled Water Policy — 2009
Local Stakeholder Cooperative Development
of Implementation Plans
Basin�wide Management of Salts and
Nutrients
Salts -Total Dissolved Solids JDS) and Chloride
Nutrients -Ammonia and Nitrate plus Nitrite
(nitrogen compounds)
Salt and Nutrient Management Plan
Required Components of the Plan*
Basin -wide water quality monitoring plan
Emerging constituents consideration (e.g., PPCPs, ElDs)
Water recycling and stormwater recharge goals and
objectives
Salt and nutrient source identification
Basin load ing/assimilative capacity estimates
Salt mitigation strategies
Anti -degradation analysis
Salt and Nutrient Management Plan
0
Suggested Elements of the Plan.
Background — to include stakeholder roles and
responsibilities
Groundwater Basin Characteristics
Basin Evaluation
0
Salt and Nutrient Management Strategies
Basin Management Plan Elements
CEQAAnalysis
Anticlegraclation Analysis
Plan Implementation
Questions,
Qbp
17
If I
PPO
il S�
Topics to be Addressed
0
Updated California Water Plan Strategies
0 2005 California Water Plan
0 24 Water Management Strategies
e Updated 2009 California Water Plan
27 Resource Management Strategies
Other Potential Strategies
0 0
Plan for Updating Region Description
e Existing Data Sources vs. New Sources
Identified Regional Objectives
0
The originally 24 Water Management Strategies were
1 0 0
organized into 5 regional IRWMP objectives:
• Reduce Water Demand
• Improve Operational Efficiency
• Increase Water Supply
0
Improve Water Quality
Promote Resource Stewardship
0 0
2008 IRWMP Objectives and CA Strategies
Aciriculturai Water Us;e Efficiency
Urt: an Watle r Use EIrciency
Agricultural Lands Stewardship
Fcnnomic Incentives
Ecosystem Restoration
Floodplain Management
Recharge Areas Protection
Urban Land Use Manaciement
Water-Derendent Recreaticn
Watershed Man agament
California
Waler PI a n
nr!nHng WatetTreatment nn,� n�!tflhirtlnn
(�round�teOAquffer Remedlation
Matching Qualitflo Use
Pulkiliur Prevuritiun
Urban Runuff Managerneint
Conveyance
system Re-cipelancin
W�terTrarsfpn
Conjunctive klariagementf
Orniinrl�ief Storage:.
DesalinaliDn
Precipitatibin Erharcement
Recycl�d Muriidp�l Water
Surfaue Storage — CALFED
Surracia Storage — ReginnaAfLucal
Required Stakeholder Involvement
DO 2oo8 strategies still apply?
Are new strategies applicable to the region?
* Examples of regional strategies
Are there resource management strategies not listed in the
California Water Plan that the group wants considered in
the Plan?
e Examples of strategies
See handout showing current Regional Strate ies (rows)
and current California Water Plan Strategies (columns)
0
Relationship of Regional and CA Strategies
Cal
ifcIrnia
Water
Plan
Strateg
ies
TABLE 4.2-1
f I
UPPER SANTA CLARA RIVER REGION WATER MANAGEMENT STRATEGIES AND CALIFORNIA WATER
PLAN RESOURCE MANAGEMENT STRATEGIES
15
w
w
REDUCE WATER DEMAND
Urba - I s, =fficimnry Measures
E�'= =--: :- 3urveyFrcgrams
E!%'= 7 --- Plurbing Re7oft
E�-,z �a 'urlift
D2- - '.I = ., ) % - - �-es
ELI= 7 L)i: :s �1:s ::-:�---.ion
F-'= -h
EI%'-
IF
EI -,Z 1) --1 n
E'-'= i)l
EV= h: i -Ass �t�.ce Pro7ams
E-- = ...:- 1 1 -0
ELI- i n �D,4;na!I
EI,= .: -: . �I-III
El, bl- --.: sh Toilet Replacement Poqam
Agr;-117L -1 -IIx-
IMPROVE OPERATIONAL EmCIENCY
Rehabildation. ReRacennent. or R�al nf ExiEtng =�-ilfl es
Impeuved O�rafional Eff ciency Meas,.Ires
IntErhe PmIeGt5
INCREASE WATER SUPPLY
Surface ReserIIoir w SItarage T:mk
Surfacei Water DiIoersion
Smunctivater Inctraction Faciftnes
Aquffer Star�,It and ReI
Gnaturdwater Management and Planning Policies
G�ndwater Replenishment Includino Spreading Grounds and InIectim Wells
AzN far REnharge mnffi Reclaimed Water
Aqufar Recharge mnffi Se02
Hydratcgic WdEling and Mcnitoring
2009 Resource Management Strategies
Reduce Water Demand
• Agricultural Water Use Efficiency
• Urban Water Use Efficiency
Improve Operational Efficiency
• Conveyance - Delta/ Regional/ Local
• System Reoperation
• Water Transfers
2009 Resource Management Strategies
Increase Water Supply
J
Conjunctive Management/ Groundwater Storage
e Desalination
2oo8 IRWMP said this not applicable to Region. Still the
case?
• Precipitation Enhancement
2oo8 IRWMP said this not applicable to Region. Still the
case?
• Recycled Municipal Water
• Surface Storage - CALFED
e Surface Storage - Regional/Local
2009 Resource Management Strategies
0
Improve Water Quality
• Drinking Water Treatment and Distribution
• Groundwater /Aquifer Remediation
• Matching Water Quality to Use
• Pollution Prevention
• Salt and Salinity Management (NEW)
* Is this applicable to Region? Examples of this in Region?
• Urban Runoff Management
2009 Resource Management Strategies
Promote Resource Stewardship
• Agricultural Lands Stewardship
0
• Economic Incentives
• Ecosystem Restoration
• Forest Management (NEW)
* Is this applicable to Region? Examples of this in Region?
• Land Use Planning and Management/ Formerly Urban
Land Management
• Recharge Area Protection
• Water -dependent Recreation
e Watershed Management
2009 Resource Management Strategies
Improve Flood Management
e Flood Risk Management (NEW)
* Is this applicable to Region? Examples of this in Region?
Other Strategies (NEW)
• Crop Idling for Water Transfers
• Dewvaporation or Atmospheric Pressure Desalination
• Fog Collection
• Irrigated Land Retirement
• Rainfed Agriculture
• Waterbag Transport/ Storage Technology
Region Description Update
0 0
Major sections will be updated with most recent and
available sources to address:
*Land Use
*Ecological Processes
*Water Supply
*Flood Management
i i i
Regional Vulnerability to Climate Change
Required Stakeholder Involvement
Other Sources for Region Description Update?
Major Water Issues and Problem Updates?
Strategy Update Considerations
Land Use
ExistinLj Data Source
2004 Santa Clarita Valley General Plan Technical
Background Report
Strategy for Updating
2011 City of Santa Clarita General Plan
2011 One Valley One Vision/Santa Clarita Valley Area
Plan
Ecological
Processes
Existing Data Source
2005 Santa Clara River Enhancement and Management
Plan
2003 Business Plan for the Angeles National Forest
1999 City of Santa Clarita General Plan, Open Space
and Conservation Element
Strategy for Updating
2011 City of Santa Clarita General Plan and Santa
0
Clarita Valley Area Plan, Conservation and Open Space
Element
2010 OVOV EIR
Recent land acquisition reports /documents
Water Supply
Existing Data Source
2005 Urban Water
2005 DWR Reliabil
DWR 2002 Califor
2003 Groundwater
2009 Santa Clarita
2oog Groundwater
Management Plan
ity Report
iia s Groundwater Bulletin 118
Management Plan
Valley Water Report
Basin Yield Analysis
Strategy for Updating
2010 Urban Water Management Plan
2oog DWR Reliability Report
2010 Santa Clarita Valley Water Report
2010 Santa Clarita Vallev Sanitation District Reduced
Discharge Technical Study
2012 Recycled Water Master Plan Update
Flood Management
Existing Data Source
United Water Conservation District and Castaic Lake Water
Agency 1996 Water Resources Report
Strategy for Updating
Sources?
Regional Vulnerability to Climate
Change (NEW)
Strategy for U 2
Climatle e Technical Study
City of larita, Climate Change Assessment
Ft h,
Linkage between IRWMP
Objectives, Strategies and Projects
Regional needs, issues and goals the lRWMP
addresses
Ex. Increase water supply
General means for addressing identified needs
and achieving broad objectives
Ex. Groundwater replenishment; increase recycled
water use; removal of invasive plants
Specific implementable means of carrying out
strategies and ultimately realizing objectives
Ex. SCR San Francisquito Creek Arundo and Tamarisk
Removal Project
Iroject evaluation and prioritization based in part on
applicability to regional objectives
Upper Santa Clarra IRWMP
"oot
.111, oo�
o&P
kel
vo
ell
liwt�s (i)
ma *171,71417, 1 � *-A
1 r nm.m w nwarowl
I E-m-
,�s
s
I J7rL7,fjtj[GclTr 41 M 71 41 *7
=MI
F u n d I n 97,
6 a
Propostion 84
4 0
Proposition I E Stormwater Manerw�l
C) j
,I , r
puj, Pj. Fr (o nx I m c i t Qe S c h ea d U I es. �r)
Prop 874, imple...)mentiaflon
Ap p lic a nt Wo rksho p s
Application Deadline
Public Meeting on Funding
Recommendations
DWRApproval of Final Grant
Awa rd s
Ja nua ry 2013
March 2013
August 2013
September2013
All r
p., purowdimate Schedule
P rop I E S tico r , mm, vw\vco7 ter
Ap p lic a nt Wo rksho p s
Application Deadline
Public Meeting on Funding
Recommendations
DWRApproval of Final Grant
Awa rd s
November2012
Dec e m b e r 2012
May 2013
July 2013
*) t �)
Chang e.,,..,cs mo Plan Stianda Frcds
0 �910WXWM M W(U
> ("firrif ' N I
> r
.�Vol
> INIO ftloff.A.
E no no
*io
Pi b I e G r a n t P Fr, co)jj e dits
Proposition 84
If1w CCV ba a lio ao d the
(0 t P, r jou i r I co j i rj VI 0 Idt ex
LAW
rj r
be.
Proposition I E
6 )\AUS, \/Jejjr mij -E.Dla ba jelmll"S
Grant PFr(olj ect Ell 97,pl b itiyy
C I tr 6i; ). Frl (07
Wyn afi-dopewe ilzAf/W
11 Let aitaxir TT49 amy \JIP
A[p
:V'fi 4M
/��,J�'W�Cj f a
%,:W% Ij U �C �a
Xa�
-Wig
[�.�,,Jj a jap,cirldr-Irle �e Oq!
#JV VJ
Q -ant Appl rual
Gt®r, nron
A rit a c h m ou n, It s.
Work Plan 15
Bud g et 5
Sc hed u le 5
Monitoring, Assessment and Performance
M ea sures
Technica I Justifications 10
Benefits Costs Ana lysis 30
Program Preferences 10
To ta 1 80
n , ru r Mi ti o s�ofl A n ca. I y s I s
MEOW
jro
nrAcylb"ju al Lei
vh®rjr
r r oo� 't
e p le r Ig o r I j h) 'EA r I a I
A p p1l ruatii r(a n /Ak i i it a c h m n titst
"am 0 "F 4
Technical JV9411ROWMAN
4) S j P'S :)4a 04 =4VW w it:
AS b4 )dad
�J- r%
�� 0 -�Wo 4
Santa Clara River South Fork
Rubber Dam No. 1 & Spreading Grounds
Los Angeles County Flood Control District
Water Conservation Planning Section
Olt 14
N
esa
1W 6
of
ROO,
I
Do
z!
16
M
To
( L4
40
C.
q. IL
v
oi Clip
IP
el,
Ph-
oo�
oo
oo
01
oii C"j!q
01 p I&,
tot,
At
ots
ots
—eQ oi
r jr,
I
No L�- too-,
aflAll" 0-
o,c-, �,U N --AA. II NeA GESCID
12 oil 2 Goggle
Iq age J S GeoW A surve -0
IYAN
le,
Proposed Water Recharge Project: Location Map
IIIA, , �
A�43M,
ell
Ou
ik I
000 v.
hL
*
SO
Existing Drop Structure at Rubber Dam Location No. I (Looking Upstream)
Pedestrian Bridge and Bike Trail at Dam Location No. 1 (Looking Downstream)
1�
4k�,�
to
Strearngaging Station in the River
M 0
Efficiency Strategic Plan
IRWMP Proposition 84 Round 2
Implementation Funding
a M
SCWD Water Use Efficiency
Strategic Plan
Completed July 2012
Strategy to provide tools, incentives and
education needed to promote ME and affect
behavioral changes
Targeted a suite of programs to achieve 20%
by 2020 goal
N
Designed to be implemented immediately
All programs were vetted for cost
effectiveness
Valleywide WUE SP was completed in 2008
Acts as "umbrella of projects for all areas of
0
the Valley where all purveyors are involved
The SCWD WUE Plan focuses on additional
conservation programs needed to fill gaps
Together, both plans work toward achieving
SBX7-7 goal of reducing water demand by
20% by 2020 and promoting stewardship of
our water resources
Create incentives and develop outreach programs
to encourage behavioral changes
Ten programs that after implementation will save
over 4400 AF by 2020:
• Residential Audits
• Low -Flow Showerhead Distribution
• Ultra -High Efficiency Toilet Distribution
• IVIF/ Institutional HE Toilets (and direct install)
• Turf Removal
• High Efficiency Nozzles Distribution
• Large Landscape WBIC Direct Install
• Residential /Commercial Rebate Program
• Large Landscape Water Budgets
1jectives Addressed
Reduce Potable Water Demand
Increase Water Supply
Improve Water Quality
Promote Resource Stewardship
Promote Projects and Actions That Reduce
Greenhouse Gas (GHG) Emissions
P r0i ect Readiness
Project is ready to implement
Currently implementing 3 of 10 programs:
Low -flow showerheads
HE irrigation sprinkler nozzles
HET and HEW rebates
Proi ect Ranking
Eligibility Yes
Readiness to proceed - 100 of 200 possible
points
Multiple Objectives - 75 of 100 points
Multiple Resource Mgmt Strategies - 8 total;
40 points
DACs, Native Americans
Justice Concerns - NA
and Environmental
Consistent with Land Use Plans - Yes, 100
points
0
Improves Interregional Coordination - No
m
mhj /mwLJ)AA j
lo e Mov
j
PY440 pztwo 40
Frank Guerrero
Santa Clarita Valley Sanitation District
September 27, 2012
A J 0
*Valencia and Saugus Water
Reclamation Plants (WRPs)
*Tertiary Treated Recycled Water
*28 MGD Design Capacity
20 MGD Current Flows
*Serves 250,000 people in
Santa Clarita and
0
unincorporated areas
yea UO kj
*Set By Los Angeles Regional Water
Quality Control Board
*Chloride Limits of 100 mg/L or conditional
117 mg/L in Santa Clara River
*WRPs not designed to remove chloride
*Alternatives being evaluated
. Source Control
. Upgraded Treatment
. Others
7 2�w'.
& Lr);)
I
jAijbe fil wiallav
I
jbioriab tolh ic
P -t -t RAM ria''a Pt gitim
AWLP 6j
j it DA 1,
*Rebate is 75% of the reasonable value for AWS
($206 to $2,000)
*Free AWS removal & disposal
*Free AWS pickup if residents remove AWS
themselves & reimburses $50 for materials
Ow
A )01JRVJ4� 76 Lf) n4p
Public Outreach Element
(through September 15, 2012)
AWS
Removed
Phase I & 11 Rebate Program Removals
7)070
Rental AWS Removals
835
TOTAL REMOVALS
79905
ESTIMATED REMAINING AWS in OPERATION
500
Y Llintom )ija 3
p am Yd 9 w I B lid ftigUal e As 9 104 *am 99% ID �Ywb
Doi ptojad
r
9 Enforcement Program
� Preliminary Notification Letters Sent August 2011
Known/Suspected AWS
Confirm removals
Notification of Future Home Inspections
� Reduced Minimum Rebates ($150 = $2000)
Still most cost effective way to remove chloride
� Pilot home inspection program
Determine best use of resources
Escalating enforcement
Issue Notice of Violation
No initial fines
� Increased Chloride Monitoring
i
pzoat� JtWA
ML
9 Continue public outreach program
0
Project Goal
Reduce chloride in WRP Recycled Water
. (up to 5 mg/L)
Prevent backsliding
9 Approved by SCVSD Board of Directors
Estimated total O&M cost of $3.3M over 3
i
period.
year
WA ir iry 0 Lei
*Reduce Potable Water Demand
0
AWS Regeneration Process is Water�lntensive.
7,800 to 10,400 gallons of water per year (EPA)
*Improve Water Quality
. AWS Regeneration Process adds chloride
0 0
*Reduce Greenhouse Gas Emissions
Minimizing the size/operation of future
energy -intensive chloride compliance
facilities
ffi 0 -1
&a n )
nrj
*Primary
. Salt and Salinity Management
*Secondary
0 0
. Urban Water Use Efficiency
. Pollution Prevention
0
tt� DQ2�
�*Vj dal4wo k A 6
pitalm
-Oblnl )
LLjhl L
DheievAola,
P p f
J�ml allij
xP LLJM PM
lilb j4p A je
L01 )Inj D
Main UV components: UV
lamps, channels housing
the lamps, power
distribution equipment,
and associated control
WW&mmon in the U.S.
after chlorination
Chlorination/
Dechlorinatio
n System
Filters
Final
Seclimentatio
n Tanks
QL% u Leju LA
jo
Flow
Equalizatio
n System
Aeratio
n Tanks
Primary
Seclimentatio
n Tanks
PYDPD is
UV Facility would be con
ructed on the top of the existing
chlorine contact tanks
AP
WA A �-§ '
]Lyll JeblAlaA it) A
*Main Objective: minimize chloride addition
during the wastewater treatment
*Additional benefits from UV disinfection
� Reduces environmental health and safety risks
� Improves water quality
� Eliminates risks with over dosing
WA ir iry 0 Lei
*Reduce Potable Water Demand
Meet Title 22 for Recycled Water
(Match water quality to use)
*Increase Water Supply
� Meet Title 22 for Recycled Water
*Improve Water Quality
� Reduce Chloride
� Eliminate Potential for Disinfection By Products
*Promote Resource Stewardship
Idnij0 -1
&a n )
*Primary
. Pollution Prevention
. Salt and Nutrient Management
oSecondary
0 0
Urban Water Use Efficiency
. Recycled Municipal Water
. Agricultural Lands Stewardship
Ink.ounHat GanvonGrIac
lit
Upper Santa Clara R ver InIfflTed, Regi rrr g
i Ld, 4.
foxe I Wor
4 �Yf
�,'Wf 4'
Bou u.et Canyon Network
Fall 2012 d
0
Who is concerned?
0 Bouquet Canyon Private Property Owners (BCN)
0 Natural Resources Conservation Service(NRCS)
0 LA County Fire (Bouquet Canyon Unit)
o AV Resource Conservation District (RCD)
0 US Forest Service (USFS)
AV' �Pv, I
Or
- I , -,�A'Mwkl t
I - .1 ty W, A WA
LL
Mtrj;tjaKV, 71,2i r., 5, -, I /,i.lel 11 1 1 1.., 1 1
0r F PIV,
0 1 1 1 1
I It
Ird I
vl�
Io-
-.AI� ;I I
Protect Critical Watersheds
�7
PYMMid
I Lake A
Castaic
Legend
MajQFTributory kk Jr
Minor Tributary
Administrative Boundry 05 12CIO
0 25 5 ic
Kilo mete I
imiles
0 5 10
cl
8.1 miles Santa Clara VVatershed
b 'c Western Portion
P
R p
%iia!i--- -�t,- ELES NATInNAL F,. -,F;'-- I
Habitat�
LaWe-Hj
Rive
Aqua
3.3 miles
Private
Riparian
Habitat
W I 't a concern?
hy's 1 E
Bureau of Land Management
estimates that the United States /S
losing 6, 000 acres of public land every
9 8
day to Invasive non�native plants,
rendering land economically useless
a 8
and biologically Impovenshed
-The Role of Herbicides in Preserving Biodiversity
Sigg, J. October 1998, Fremontia 26:4
from Arundordonax
LLvAk,-uY,,jMl W&M, were created
were creae,,
s
b y
ny
v
le* 'ia IM I s im
;betw;echFth s by the Rico Reed omp.any
ny in. alifornia
W
O_tF v or 'Arundo donax- i
fid
Y orem qu rai s in S�
-1. L MA -- -- --
bloe IFY
I�i A
ct
; 0
Where is it a concern?
07�
7 77�
7
jL.C=t-4& AJVC;�j�L-A�,4� Forestry oundar
4L
If
- - - - - - - - --
Ai
MOMENO"Ood'a
a
s private aoqw-'Cou
How much concern is there?
0 0
1. Do we anticipate the control of invasive
0
weeds prior to their establishment ?
11. Do we desire to conserve the biological
resources of our local ecology; specifically
native flora, fuana, and especially water ?
111. Do we want restore our local tributories
0
in order to preserve and secure our
watershed for the future ?
Five Ma i ors Steps
Secure r7pDer
Biolo
Af
First Ta
=1
w I � 44
Initial Funds of WRIP
Project Task
WRP
BCN
NRCS
CEI CCC
SUBTOTAL
$15000.00
TASK
1. Map & Biological
$2,700.00
$1,500.00
$2,400.00
$103700.00
Monitoring
11. Remove &
$89300.00
$13600.00
$4,500.00
$14,400.00
Dispose
Ill. Prevent
$800.00
$300.00
$1,100.00
Reemergence
IV.Restore,
$59600.00
$1,500.00
$42000.00
Revegetate, &
Educate
AVRCD
$1,840.00
$13840.00
Administration
Fuel (Diesel, Gas,
$1000.00
$1000.00
Propane)
$20j240.00
TOTAL:
TOTAL
$2,900.00
$3y000.00
$2,400.00
$4,500.00
1 —1
$33y 040.00
Budget Notes
BCN = Bouquet Canyon Network (Private Property owners of 3.5 mile stretch of Bouquet Canyon)
NRCS = Natural Resources Conservation Service and Earth Team Volunteer
CEI = Cooper Ecological Monitoring, Inc.
CCC = California Conservation Corps
AVRCD = Antelope Valley Resource Conservation District (Grant Administration 10%)
Note: Contributions by BCN, NRCS, CEI, and CCC are "in-kind" or donated hours of labor, equipment, or expertise provided to the project.
S -k
TP.
f�,44 d % I a
% %k 0
4,v 1
I t k
14 L
I p
.,a . %
Ir
Create a sibe�spebzffi: ap o rundo dohaxl-,
p
1110'.
14,
4k , J -
v
I U,
A,
3.5 mile section of Bouquet Canyon Creek and the
040 Te:
location of three invasive weed 'h&tspots. (2ANYON FIRE RE)
Ll --I—
LOS
61
RD
Z CANYON PIE)
dW
ov
ESGUERRARL)'-
CALTON RD
VMS
too
**Iv oo 0
Ar gpaw�
d
allay 47 lan
La
a
k law
r
Q&I -�
aa.,,r
"Oil
not,
oil
"all
r. - a 9�2 qr ORR
aa-,aaaa- a II..
9f all
L'J�
ST�ala5wn
all.
ntppr-q
i re Bi-ble Tabernacle CCC)
.11 1 ff a do fj
104 t
ow
4%L
�vn I�
'Af
LI Im
It -
117
114
11h,
I IL Aft. �16
LA -c 0
VL
low
Ab
HFBouquet Canyon
ep, -,Ole
7
nent
;hoc
VL
low
Ab
HFBouquet Canyon
ep, -,Ole
7
nent
ll�
MA" bom spmn
rT
Ar
Mir
00
e N 45%
T-17
It
LL
ftim� -,
L
f L�%.h
Li
ZL
Ll�ll
IL
1p N:M.
UPPER SANTA CLARA FLIN-ER WATERSHED
ARu� � TAm�SK REMONAL PROGRAA1
Lolvc�TERM IMPLEMENTATION PLAN
K
n Valley
VE� CoL� R�um� Co�A�� D��
J� 2"6
- _I�L`j r2i)
'6
no 1 0 5
1h f 1,
C P
c V,,
Morris es, 0105 X, Somali
a mVnn , F--,
0, Also Ceram
W '�6 R
Form camyces
5. ,a",
I a=4 C"Me e 14 Reach 2 Reach 1
o c"ye, pio�fd Reach 3
Reach 4
ANES
soo.�
R R _h5
Hashaj `i*N -
%j Way 0,1, Spring C"j I
Reach 6 1.
Want
'Chl
c= S;nd "wheran
�1111sa
\a
- .Is
L ac ___16y' 4cs.
'joh,
Upper Santa Clara River Shita-Watershed —Santa Clara River Reaches
Legend
=Cwhy
E-Deemw Pro=.Ara,
-- Rj j
alarshos, cars Slash Fammul
P ... h 1
R ... h 2
Reach 3
Reach 4
reach 5
Rgac46
Major Roads
— Limited faces Harvey
— Hgj�
— Major Rcaft
ILeecalion Map
r
�LE IN MILES
io
!IS m
0 T
ILL, ILL,
ILL
Mt
Aj/ III -
lot C
ILL
LLI
Lt
LI L!Icr I
T- I PI ILL,
LILL=
ILLILL,
4
Low Impact $4,000,000 to
Development $6�000�000
Voluntary Septic Tank
Retirement
Santa Clara River
Arundo Removal Project
$150005000
=I"'
50% $8,000,000 to
$112�000�000
25% $115250�000
$2�0005000 25% $25500�000
Total $7,000,000 to 40% $11,750,000 to
WOM000 15)750)000
A �01
, k
r
rP . V - -..
AL. J7al t MY
LOWr
jLa ttl ee, r, IW 7se-I E f1f i re I i
lfi� MC y
§ TLolf N � 4 mi qC P, d'i
.,If.t7e,
Background
Santa Clarita Valley Water Use Efficiency Strategic Plan
(SCV WUE) adopted in 2oo8
SCVWUE Strategic Plan included ($1,000,000 budget)
• High -Efficiency Toilet Rebates (single and multi -family)
0
• Large Landscape Audits with incentives
• CII Audits with incentives
• Residential Landscape Contractor Certification (with wbic)
• High -Efficiency Washing Machine Rebates
• New Construction Building Codes
• Social Marketing Program
9
_17w
to ect Description
1) 1 1 E*4t i �f "' -
rograms in SCV WUE Strategic Plan update x
L %.eady to implement
5 m'll'on dollars over 2 years
FW AR Ar
Yt*
Program Development
M Mal ramwiffictiaginnal 0 �R�dyTumer Thai
Cid R Dinned)-flurrhadiff
01 O��vowsdebt cution
51 Hot Programs I
(I — I D wasposcOgRipsoprogramycom
Search
no
D evocrage, Cc nueaDmill 0 Toofflow Vill Clut�W�s Me. U S�� Shas D Irri gat ion suffocate. D D Manumphalcol D Plug toral . F I DissundraceQuai
SCV H20 Programs
ILL
Missouri -
p�F&�
Fbi
Request new Password
Navigation
Welcome to SCV H20 Programs
To get started, simply follow these three steps. It's fast and it's easy!
I Valuate your Program by sets ding Me icon of your age navy becress'
2 Enter your account numbs r of code and OM211 address
3 Life sedismacrIT deals Year accountand �aut�a�T� Ing you In You cal Thai after causes. darfinclatern our User
pool and get access to great wated saving resources �r
-You only need to goods your destant on your dosaaft On subsequent Paris at you need to do is login whar Me command and
awswarodyisuchathadatroodepon
" You need to write down your us ansuffer and reasswordo' Thai amposs to the site
LArWD
I
I... P
loan
0 Fill IN IF
The SM Family at Water Cupp em gicamily) Is comprised of CastaccLake
WAnAgency Los suppose Carry Waterworks Thousand Newhall Counts LACW
Water District Santa Giants Water DIAs ion surged Water Company and Me
Cry, of 33 na C ana Together they work to parnmer Me officheart Use of wand N
NCWD
and fund programs to reduce the per capita water use in ourValey.
Search
Seyyrch days whe
F--
I �&i
Validated User Login
Fb
Oncesou have validatedyour
account please login below If
you have not validated your
account Marvel on our
off I I
Missouri -
p�F&�
Fbi
Request new Password
Navigation
Welcome to SCV H20 Programs
To get started, simply follow these three steps. It's fast and it's easy!
I Valuate your Program by sets ding Me icon of your age navy becress'
2 Enter your account numbs r of code and OM211 address
3 Life sedismacrIT deals Year accountand �aut�a�T� Ing you In You cal Thai after causes. darfinclatern our User
pool and get access to great wated saving resources �r
-You only need to goods your destant on your dosaaft On subsequent Paris at you need to do is login whar Me command and
awswarodyisuchathadatroodepon
" You need to write down your us ansuffer and reasswordo' Thai amposs to the site
LArWD
I
I... P
loan
0 Fill IN IF
The SM Family at Water Cupp em gicamily) Is comprised of CastaccLake
WAnAgency Los suppose Carry Waterworks Thousand Newhall Counts LACW
Water District Santa Giants Water DIAs ion surged Water Company and Me
Cry, of 33 na C ana Together they work to parnmer Me officheart Use of wand N
NCWD
and fund programs to reduce the per capita water use in ourValey.
a
IRWMP Objectives Addressed
• Reduce Potable Water Demand
• Improve Water Quality
• Promote Resource Stewardship
Promote Pro) ects and Actions That Reduce
0 0
Greenhouse Gas (GHG) Emissions
Pro i ect Ranking
Eligibility - Yes
• Readiness to proceed - 175 Of 200 possible points
• Multiple Ob)ectives - 6o of ioo points
• Multiple Resource Mgmt Strategies - 9 total, 45 points
• DACs, Native Americans and Environmental justice
Concerns - N/A
Consistent with Land Use Plans - Yes, 100 points
0 0
Improves Interregional Coordination - No
Castalc Lake Water Agency
Castaic Conduit
I RWIVIP Proposition 84 Round 2 Implementation Funding
I RWMP Stakeholder Meeting
October 25, 2012
9 62
CASIAI C mw
wL A K Im
0
7�
z 0
�Cmmmw
M M
2.o 12. P
I I QQ(
Castaic Conduil Canyon
ot pailk
U U
0 2 0
al
ft Pampk% 0 Alf
Frei DI
A -C sari
"twoB.'l, d z
F Proj ect 7- Part
r
Airy t 0
pf, L Location J, 0
)?elch Ito 11�p 116, Ice or 0 744 CB0
04 Cue'la) k
of
0
ea 60 a
10
V4 ea C.
I Ambaor
ea
eat 0 Callata Or 49a
0 on 6 4
ef,4 NO t V 0 e7v
C, e e �� > a posac
%0 oil, Ip dreo or Central
'k 49* ell C ca
coos �00 �%Bs` * > r�'�Iew Or
`lf, 00 op al" #0 e�lavldad Of Park
66' At 4 l?3l3qoaI of
ea ea itl
p oka� V 41111, Gra�erf<�o fir espo Okla Or
o' 4111, brideallyorl
Six Flags Cornmi
Magic aaf�> Bridgeport tn Park
Mountain Nevins" "a"c"
Magic Molooter, Ph, �?iv,rcbase C, 4t2 o� S(
4Fg,., Saugus
40
NaDr
fjo m
o;
.P, r1r, c
Q! 00
C3iintry vai ell C 40 d5l %NY 13
CIU13
x I Town, 126
04 Center Santa
9�
Clarita >
15. ),Be
Tournament
,af"IGO,
wesuridgre Players Club
Valencia
College llfarifalmsts Q.
Of The 0 Valencia
Canyons
0 0. Catcall Dt
0* L3 0
'*a'
C
0
Ca�
n
�Ica Circle Word Ln
J Ranch
'46a Park
to, 6B %
0 Mcbean Pky
califorraij
0 Institute lititl cn%
S C
0 Of The Arts
1 Yfllq�
Stevenson le
ek� 'A Pace
Ranch Tj se c
<B eylrb f� Ra,
I
A F 0 0 IF r
44.
VII I
i�
r
Castaic Conduit
Project Readiness
6 Project is ready to implement
6 Preliminary design complete
6 CEQA complete
6 Permits in process
0 0
Construction drawings in process
6 Design funded in FY 2012/13 capital budget
6 Anticipate Construction: FY 2013/14
0
Estimated Total Project Cost
MUM=
M -I
I RWMP Objectives and
Water Management Strategies
6 1RWMP Objective
�� Increase Water Supply reliability by improving the system's
operational efficiency
6 Water Management Strategies
�� Improve Operational Efficiency and Transfers
v'Conveyance
Castaic Conduit
Project Ranking
6 Eligibility � Yes
6 Readiness to proceed � 150 of 200 possible points
6 Multiple Objectives � 15 of 100 points
Multiple Resource Mgmt Strategies � 1 total* 5 points
f
6 DACs, Native Americans and Environmental Justice Concerns � NA
6 Consistent with Land Use Plans � Yes, 100 points
4 Improves Interregional Coordination m No
Foothill
Connection Proi ect
IRWMP Proposition 84 Round 2
Implementation Funding
Foothill Feeder Connection Proi eo
Since RVWTP start-up in 1996, CLWA has
received SWP water through a temporary"
connection, which now has 60 MGD capacity
Raw SWP water from Castaic Lake is wheeled to
RVIPS and RVWTP via MWDSC's Foothill Feeder
pipeline
Permanent connection design completed
1012012
Can be implemented immediately
Capacity is needed
Current RVWTP permitted capacity is 66 MGD
Ultimate RVWTP capacity could be up to 90 MGD
Permanent connection will allow for 90 MGD
Allow RVWTP to operate at full current rated
capacity of 66 MG
0 0
"Permanent" connection is required
Project will provide additional tie-in from
Foothill Feeder to CLWA raw water line to
serve as a back-up when primary feeder is
out for maintenance
Construct and install new vaults, pipelines,
valves, electrical equipment and control
systems to increase capacity of line that feeds
RVIP Station from 60 MGD to 90 MGDE
1jectives Addressed
Increase Water Supply
P r0i ect Readiness
0 0
Design is complete
Project is ready to implement
Proi ect Ranking
Eligibility Yes
Readiness to proceed - 175 of 200 possible
points
Multiple Objectives - 15 of 100 points
Multiple
points
Resource Mgmt Strategies - I total; 5
0
DACs, Native Americans
Justice Concerns - NA
and Environmental
Consistent with Land Use Plans - Yes, 100
points
0
Improves Interregional Coordination - No
Castalc Lake Water Agency
Distribution System Rio Vista Valve No. 2
(RV -2) Modifications
I RWIVIP Proposition 84 Round 2 Implementation Funding
I RWMP Stakeholder Meeting
October 25, 2012
9 62
CASIAI C mw
wL A K Im
0
7�
z 0
�Cmmmw
M M
2.o 12. P
I I QQ(
Distribution System RV -2 Modifirations M
U Canyon
Park
as
4F
VI
c A20
Coo
a C1361a
Part
Airy 0
Decora Or a o�
pe Carl
Ofr�() or 0 744
elp
0
The 60 Is
10
4s z 0 Ambaor
4
0 Or 49a
0 op 6
0 ani
0 C, 40� a, 0�0
93 %0 oil, o� cof pos, a or
1� 0 � X� Ctrco 4D
0 T P"'�Iew Or � r Central
e cov, Of Park
e0vldad of
CI b ?3j390aY
oka� V// Brideapoarl Ginellelto 00 4k: Espai at%U Or
Six Flags Conarri
Magic Bridgeport tin Park
Mountain Nevins" Ra"cn
Magic Also,,tari,
r S us
A C 0 . I %IV ,�ock
40 9 �00*slq, Naor %P Triangle
n ft ov
or
.P, 0
Valencia 00 Circle
'c Its, 13
C3iintry Valencia 4�
CIU13 Town 0!
04 Center 126
9� C; Santa
0 Clarita >
Ab
Valevicle ON 15.
Tournament
Players Club
Westridge
Valencia
College rfanfamsl�
Of The 0 Valencia
Canyons
0 1 e C2rclill of
0* L3 0 kjiader:%4D�
'*a'
C
0
Ca�
n
Circle critiord Ln
J Ranch
Park
TO to, 6a %
:No 0 California Mcfacan Pay
Institute
0 %,to
S0 Of The Arts
I
ek� Stevenson
A
0 Ranch 'A P040
eck
MIA
aim -
IF
el;
vaun bite
46KL Ifth-1
IF
Distribution System - RV -2 Modifications
Project Readiness
6 Project is ready to implement
6 Preliminary design complete
6 CEQA complete
6 Permits in process
0 0
Construction drawings in process
6 Design funded in FY 2012/13 capital budget
6 Anticipate Construction: FY 2013/14
0
Estimated Total Project Cost
3W=#H**T:T'K'T'T'X U*109=
M
I RWMP Objectives and
Water Management Strategies
6 1RWMP Objective
�� Increase Water Supply reliability by improving the system's
operational efficiency
6 Water Management Strategies
�� Improve Operational Efficiency and Transfers
v'Conveyance
v/ System Reoperation
Distribution System - RV -2 Modifications
Project Ranking
6 Eligibility � Yes
6 Readiness to proceed � 150 of 200 possible points
6 Multiple Objectives � 15 of 100 points
Multiple Resource Mgmt Strategies � 2 total* 10 points
f
6 DACs, Native Americans and Environmental Justice Concerns � NA
6 Consistent with Land Use Plans � Yes, 100 points
4 Improves Interregional Coordination m No
Santa Clarita Valley Volatile
OMM=o0i
Groundwater Investigation
IRWMP Proposition 84 Round 2
Implementation Funding
R
SCV Volatile Organic Compound
Groundwater Investigation
VOCs have been detected in some SVC
0 0
municipal wells
Two possible sources have been identified
Others are possible
Possible sources have been somewhat
cooperative
Comprehensive investigation is necessary
N
Remediation could be required
Me,
w
hcpll
RVWTP
Santa Clara River
V vw
w Q
0
A
V-1 57
Stadium
Sa us I
0011cla Saugus 2
Blvd,
Former Whittaker-Bermite
Facility
C%
NC -1 1
�00
;O'J'O �7'
0,N005
SCV Production and
Monitoring Wells
VM
OU4
O�IDn
OU -IA
Ou I
OU4
0'
SCV production wells need to be protected
0
Thorough investigation required to properly
determine sources and potential extent of VOC
contamination
0
If the results indicate an imminent threat to
SCV wells then remediation action must
commence
Project Management by CLWA best ensures
that investigation is thorough enough to
identify
Coordinate with current efforts (SIC and
Wh ittake r- Berm ite)
Evaluate current data set, including those from
production and monitoring wells
0
Identify data gaps; determine need for additional
monitoring wells
If appropriate, locate, design and construct new
monitoring wells.
Develop groundwater model to forecast transport
of VOCS
Identify sources
1jectives Addressed
Improve Water Quality
Promote Water Stewardship
P r0i ect Readiness
Conceptual plans
Need/ Feasibility identified and verified
CEQA readily obtained as no detrimental
0
impacts foreseen.
Proi ect Ranking
Eligibility Yes
Readiness to proceed - 75 of 200 possible
points
Multiple Objectives - 30 of 100 points
Multiple Resource Mgmt Strategies - 3 total;
15 points
DACs, Native Americans
Justice Concerns - NA
and Environmental
Consistent with Land Use Plans - Yes, 100
points
0
Improves Interregional Coordination - No