Loading...
HomeMy WebLinkAbout2015-01-13 - AGENDA REPORTS - AWRD WILLDAN-LMD RESERVE STUDY (2)0 Agenda Item: 7 CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by:Kev' Tonoian DATE: January 13, 2015 SUBJECT: AWARD OF LANDSCAPE MAINTENANCE DISTRICT RESERVE STUDY TO WILLDAN FINANCIAL SERVICES DEPARTMENT: Administrative Services RECOMMENDED ACTION City Council: 1. Award contract to Willdan Financial Services for the preparation of a Reserve Study in support of the City's Landscape Maintenance District (LMD) operation in an amount not to exceed $245,000. 2. Authorize staff to proceed with Phase I of the LMD Reserve Study in the amount of $90,000. 3. Authorize the City Manager or designee to execute all contracts subject to City Attorney final document approval, contingent upon the appropriation of funds by the City Council in the annual budget for such fiscal year. BACKGROUND Santa Clarita administers 54 zones within the Landscape Maintenance District (LMD). In total, the LMD maintains approximately 1,200 landscaped acres, including parkways, 9 parks, over 20 miles of paseos, 46 miles of landscaped medians, 30 bridges and tunnels, and 60,000 trees. Landscape maintenance services for the City's LMD operation are provided through contracts with private companies. A significant component of administering the City's LMD includes the financial forecasting, planning, and management relating to the repair and replacement of capital assets maintained within each of the 54 independent LMD zones. To manage this long-term financial planning need in a deliberate manner, it is common for public agencies to undertake preparation of a reserve study. ;D Page 1 rt'' r�•�^.�t 1 9 t(�( Packet Pg. 36 u G u'tiv� .^ The City last awarded an LMD reserve study in 2008. Since this time, the City's LMD operation has grown by more than 100%. Given the number of new LMD zones the City has created and/or assumed as a result of the 2012 annexations, a new study is recommended. The purpose of a reserve study is to locate and assess the condition of existing capital assets, quantify the remaining useful life of such assets, and forecast future costs associated with replacement of the assets. Examples of such assets include components of irrigation management systems, fences, paseo bridges, benches, playground equipment, sport courts, concrete walkways, lighting, monuments, and small structures. Once completed, a reserve study allows the City to more accurately forecast long-term capital replacement costs on a zone -by -zone basis. This tool enables City staff to maintain reserve levels within each financially independent LMD zone so adequate monies are available to replace the assets as the end of their useful life is reached. To secure professional services to complete an updated reserve study, the City's Purchasing staff published Request for Proposal (RFP) LMD No. 13-14-48. Three registered firms received email notification upon posting of the RFP, with notifications sent to an additional three companies which previously expressed interest in knowing when the City was seeking proposals for auditing -type services. In total, 28 vendors downloaded the RFP, with two firms submitting proposals. The firms were Willdan Financial Services and Association Reserves, Inc. A cross-section of staff from the City's Finance, Technology Services, and Special Districts operations reviewed and scored the proposals. Evaluation criteria included an evaluation of qualifications and experience, audit methodology and management approach, and quality/experience of personnel. Furthermore, both responding firms were invited to and participated in an interview panel. As a result of this process, staff is recommending Willdan Financial Services, based on their ability to provide professional guidance, qualified staff, reserve experience, and technological experience. Prior to reaching this decision, City staff vetted each section of the proposal in order to ensure the consultant could demonstrate they possessed the appropriate experience and analytical capabilities to meet our organization's needs. Willdan Financial Services is a Division of the Willdan Group, Inc., a nationwide company providing professional technical and consulting services for engineering and infrastructure projects. Willdan Financial Services specializes in disciplines that include engineering and planning, energy efficiency and sustainability, and financial and economic consulting. Over the three-year period of this proposed contract, Willdan Financial Services will comprehensively evaluate the City's LMD zones in a manner which includes the following work products. • Identify, quantify, and rate the condition and remaining useful life of pre -determined capital assets in each LMD zone. • Analyze the total funding reserve necessary to replace essential assets. Page 2 Packet Pg. 37 • Develop a financial model that will provide summarized activity which will be incorporated in the budget model for each individual LMD zone. • Calculate and identify the dollar amount required to fully fund each zone's reserve. Phase I of this project will evaluate the nine LMD zones transferred to the City from the County as part of the 2012 annexation and nine newly created LMD zones since the last reserve study was completed in 2008. This scope of work will include a field survey which will geo-code the location of and assess the condition of LMD capital assets. Willdan will also develop a new database capable of integrating the financial model and cost -factor assumptions into an asset - management system which City staff can update and manage on a going -forward basis. Phase II and III of this project will include field work to collect location data and assess the condition of LMD assets, including irrigation systems, among the remaining LMD zones evaluated during previous reserve studies. The cost associated with Phase II is $80,000, while the cost of Phase III is $75,000. Commencement of future phases of the LMD Reserve Study will be contingent upon the appropriation funds by the City Council. ALTERNATIVE ACTION 1. Do not award contract to Willdan Financial Services. 2. Other direction as determined by City Council. FISCAL IMPACT The total amount of this agreement will not exceed $245,000. Funds in the amount of $90,000 were previously appropriate and are available in the Fiscal Year 2014-2015 budget to support Phase I of the proposed LMD Reserve Study. Funding for subsequent phases is contingent upon the appropriation of funds by the City Council. ATTACHMENTS LMD Reserve Study Proposal Page 3 -1qVWILLDAN Financial Services December 5, 2014 Mr. Dennis Luppens Special Districts Administrator City of Santa Clarita 23920 Valencia Boulevard Santa Clarita, California 91355 7.a extending your reach Re: Revised Scope and Fee to the City of Santa Clarita for the Financial Analysis to Update and Augment the LMD Replacement Reserve Fund and Field Inventory of New LMD Assets Dear Mr. Luppens: As requested, the following serves as Willdan Financial Services' revised scope and fee specific to the financial analysis necessary to update and augment the Landscape Maintenance District (LMD) replacement reserve fund, as well as conduct a field inventory of new LMD assets on behalf of the City of Santa Clarita ("City"). Due in part to the magnitude of this engagement, it has been decided that the project duration will span three years and the field assessment will focus on specific zones during each year of the project. The table below lists the proposed zones to be evaluated in each phase/year of the work plan, per the City's direction. Phase One Phase Two Phase Three Financial Analysis- All Zones Financial Analysis- All Zones Financial Analysis- All Zones GIS Platform Development Field Assessment / GIS Retrieval & Input Field Assessment / GIS Retrieval & Input Field Assessment / GIS Retrieval & Input Data Retrieval & Input Data Retrieval & Input Data Retrieval & Input GIS Mapping (in -House) GIS Mapping (In -House) GIS Mapping (in -House) 28 - NEW HALL 7 - Creekside 8 - Friendly/Sierra 29 - Metro Villa 15 - River Village 20 - Golden Valley Ranch Commercial T20- EL DORADO VILLAGE 16 -Valencia Industrial Center 21-GVR RESIDENTIAL (Undeveloped) T29 -AMERICAN BEAUTY 17-Bouquet/Railroad 22-HMNMH(in-House) T33 -CANYON PARK 18- Town Center/Tourney 23-MONTECITO(in-house) T44 -BOUQUET CANYON 19-Bridgeport/Bouquet 24 -CANYON GATE T47 - Northpark T2 - Old Orchard 25 - VALLE DI ORO (Undeveloped) T48 -SHADOW HILLS T3 -Valencia Hills 26 -CENTRE POINTE T51- VALENCIA HIGH SCHOOL T4- Valencia Meadows 1- Golden Valley/Centre Pointe (In -House) T62 - CANYON HEIGHTS T5 - Valencia Glen 2 - Price Costco (In -House) T65 - FAIR OAKS RANCH PHASE I T6 - Valencia South Valley 3 - Sierra Heights T65A- FAIR OAKS RANCH PHASE II / III T7 - Valencia Central & North 4 - Albertson (In -House) T65B - FAIR OAKS PARK T8 - Valencia Summit 5 -Sunset Hills T67-MIRAMONTES T23 -Mountain View Slopes 6- Canyon Crest T71- HASKELL CANYON RANCH T23A-Mountain View Condos Tl- Faircliff Shopping Center (in -House) T72-COPPERHILL 22 T23B-Seco Villas T17 -Rainbow Glen 27 -Circlet Ranch T29 -American Beauty T46 -Northbridge T31 -Shangri-La T52-Stonecrest $ NRlldan $ Willdan $ Wllldan Color Key Project Goals Most are new zones with no field data 1. Reserve Funding Financial Analysis Most are existing zones with data and 2. GIS Platform Development grouped in west part of City 3. Living Document - Accela Transferrable Most are existing zones with data and 4. Field Inventory, Condition Assessment grouped in west part of City Engineering end Planning I Energy Efficiency and Sustainability I Financial and Economic Consulting I National Preparedness a 951.587.3500 1 800.755.6864 1 fax: 951.587.3510 1 27368 Via Industria, Suite 110. Temecula, California 92590-4856 1 wwn Packet Pg. 39 Mr. Luppens, City of Santa Clanta 7,a Revised Scope and fee for the Financial Analysis to Update & Augment the LMD Replacement Reserve fund & Field Inventory of New Assets December 5, 2074 Page 2 Scope of Services Project Understanding At present, there are 61 financially independent zones within the City's LMD. In general, these zones are comprised of trees, shrubs, turf, irrigation, booster pumps, lighting, fencing pedestrian bridges, 20 miles of paseos, tunnels, playgrounds, site furniture, gazebos, sports courts and fields, and typical park, open space and parkway amenities ("LMD elements'). Currently, the City has inventory data information for 35 zones that can be used as reference when revisiting those sites. The inventory will be use to: a) identify existing LMD elements, b) quantify those elements, and c) analyze and determine the element's current viability and remaining life span of those elements. In addition, an opinion of probable cost for replacement will be assigned for all identified types of elements in the inventory utilizing an average cost factor per square foot, per linear foot, or per unit for each respective element as applicable in each zone. These cost factors will be developed utilizing those established in the City's previous LMD asset study. The new cost factors may be adjusted or modified as necessary based on replacement cost history provided by the City and/or cost estimates and pricing obtained from vendors or other agencies. This inventory will develop a foundation upon which future management decisions can be based. It is the City's objective to create a document that depicts a clear picture as to what types of LMD capital assets are present within the zones, as well as each asset's remaining useful life and replacement value. Willdan further understands the City wishes for this Study to become a "living document," whereby in future years, when an asset is replaced or improved, the enhancement can be documented in the Reserve Funding Analysis. This important objective will be kept top of mind throughout this engagement. Approach Willdan's approach will be to utilize ESRI ArcPad mobile GIS software for collection of asset inventory data. ArcPad software will be used to display a base map of the City on a GPS -enabled handheld field computer. ArcPad Data Collection Application Willdan will develop a customized ArcPad software application which will display a data collection form designed to capture the location and attributes of each physical asset. The data collection form will use drop-down "combo -box" menus to the fullest extent possible, minimizing the amount of data entry that would need to be inputted using the mobile device's soft key pad. Combo box controls allow the user to either pick the desired item from a list, or type it in if the item is not present in the list. The ArcPad software also has an "AutoComplete" feature that speeds up hand -entry by displaying previous entries when the user starts typing in a new entry. New data entry controls and drop-down list items can easily be added to the data collection form at any time. A menu at the top of the data collection form will list the physical asset types to be inventoried as shown in the Physical Asset List Template (Exhibit C) of the City's Request for Proposals (RFP). Additional menus will allow the field inspector to specify more specific attributes, such as types of irrigation controllers and enclosures, type and size of play equipment, etc. Another menu will be provided to enter appropriate quantities for each asset (linear feet of piping, square feet of pavement, acres of landscaping, etc.). Another data entry control will include the type of material, for example; wood, vinyl or metal for handrails, brick or Packet Pg. 40 Mr Luppens, City of Santa Clama 7,a Revised Scope and fee for the Financial Analysis to Update & Augment the LMD Replacement Reserve fund & Fie/d Inventory ofNewAssets December 5, 2014 Page 3 concrete for benches, etc. Additional data entry controls will include the condition of the asset, the name of the field inspector, the date, and a field for any comments the inspector deems relevant. The base map and customized data collection form will be loaded into handheld field computers equipped with Global Positioning System (GPS) receivers. Field personnel will occupy the location of each LMD asset. Tapping the screen of the GPS handheld will store the GPS coordinates and display the data collection form. Daily Data Back and QA/QC Field data from each GPS handheld will be downloaded at the end of each day and stored on Willdan's file servers. A GIS analyst will review each day's work. Any inconsistencies or missing data items can then be addressed in the field the following day. Quality control will also be built into the data collection software. Critical data entry items will be designated as required; the field inspector will not be able to click the OK button to close the data collection form and store the data unless all required fields have been entered. An error message will alert the inspector with the name of the required field that needs to be completed before the form can be closed. Inventory Analysis Field data is stored in the GPS handhelds in ESRI shapefile format. Once the asset inventory field survey is completed, the shapefile will be imported into an ESRI file geodatabase for use in data analysis and mapping. Latitude and longitude coordinates in decimal degrees will be added to the database for each asset. This will be useful if it is desired to export the data into a Comma -Separated Values (CSV) ASCII file for use in other spatially -enabled software programs. The data can also be exported into a variety of other formats including Microsoft Excel, Microsoft Access, PDF, Autodesk Civil 3D, Microstation and others as needed to prepare specifications and design drawings for performing maintenance and implementing improvements. Compatibility with Santa Clarita GIS and Accela Asset Management System Willdan will coordinate with City staff to confirm the version of ESRI ArcGIS software in use by the City to ensure that GIS deliverables are compatible. The appropriate file geodatabase version will be provided to the City, or can be provided in shapefile format if desired. All GIS feature classes delivered to the City will include the appropriate metadata for each feature class. Accela, Inc.'s Asset Management System software is compatible with ArcGIS databases and supports the ArcGIS Server. Willdan's asset inventory data in ArcGIS geodatabase format can be easily integrated into Accela's proprietary cloud -based GIS solution. Work Plan LMD Element Inventory To achieve the City's goal of developing a LMD element inventory our work plan will involve consultation with City staff and all pertinent representatives and stakeholders. This portion of the scope will be coordinated utilizing the subsequent methods: 1. Arrange a kick-off meeting with City staff to review goals and confirm scope of work. Finalize project objectives, schedule, zone priorities, as well as define roles and responsibilities. Packet Pg. 41 Mr. Luppens, City of Santa Clanta 7,a Revised Scope and fee for the FlnancialAna"s to Update & Augment the LMD Replacement Reserve Fund & Field Inventory of New Assets December 5, 2014 Page 4 2. Obtain LMD zone map, and if necessary, obtain City provided descriptions/points of interest of zone which require special attention while being evaluated. 3. Obtain existing relevant data from the City such as the most current inventory document identifying 35 zones (previous Reserve Study), construction drawings, existing as -built, development and irrigation plans, current renovation plans (if any), and documents pertaining to the City's LMD standards or guidelines for reference. Willdan will utilize the information contained within the Reserve Study to develop the initial framework of the financial model. While we will review the cost factor assumptions previously established for the assets within the 35 zones, a field survey will not initially be conducted to confirm the specific LMD assets and quantities. Each of the additional 26 zone areas will have a list that identifies all aspects of the LMD inventory. 4. Obtain list (including contact person and phone number) of maintenance contractors along with maps of their respective LMD area limits of work. Willdan will contact each contractor and arrange to meet in the field to review contractor's limits of work. In addition, the field meeting will allow time to familiarize ourselves with each site, such as irrigation controllers and other elements, and identify any issues that could impede the inventory process. 5. Assign a team of two for the larger zones and an individual for the smaller zones. Based on City provided documents, prepare base maps of the zones to map out the route to access the zones in a productive sequence. Each team (or individual) will have a PC tablet to document the information required for the inventory. A customized software program will be developed to house the information for this inventory and all its attributes. 6. Prepare and submit a schedule with appropriate milestones and submittal dates, in addition to a summary of tasks to be performed. The schedule will be based on previous discussions with City staff. Examples of milestone activity would include: • Conclusion of the field review (middle and end points); • Preliminary field data findings for the assets of the various zones (electronic copy); and • Final inventory of field data (asset) information (electronic copy). Field Review The following tasks will be performed as part of the field review: 1. Conduct a site reconnaissance to document the existing elements and their respective conditions of each zone. Special attention will be paid to the current functionality and remaining lifespan of the LMD elements. During this review notations will be made as to whether the various elements are in poor, fair or good condition. Generally these notations will reflect the overall condition of the various element types (i.e. fencing, benches, playground equipment, landscaping, irrigation system, etc.), but may also denote specific elements or areas that are deficient. A poor condition shall reflect an element that exhibits a safety factor and should be on the high priority list of replacements, such as a 6 to 12 month lifespan. A fair or good attribute describes an element that can withstand at its current condition for a 5 to 15 year lifespan. Packet Pg. 42 Mc Luppens, City of Santa Clarita 7,a Revised Scope and Fee for the Financial Analysis to Update & Augment the LMD Replacement Reserve fund & Field Inventory of New Assets December 5, 2014 Page 5 2. As part of the field review of the site landscaping itself, we will study the site topography and document type of terrain; i.e., sloping (say greater than 3:1 slope ratio), generally flat terrain, or a combination of sloping and flat. This information may assist in determining future costs for replacement of the landscape material since work effort/costs tend to increase when the topography is sloped. An evaluation of the irrigation system will be performed by a landscape architect or licensed inspector to determine whether it is operable or non-operable, outdated, adequate or not adequate. The evaluation will entail backflow preventer device type, size, and condition; controller type (pedestal, wall mount within cabinet); cabinet material (stainless steel or rolled steel); manufacturer, condition, verification of master control valve (MV), size (if visible without excavation); power source (hard wired, solar, battery, etc), and verification of flow sensor (FS) device size, if any. For each controller the evaluation will entail estimating the total irrigated area (square feet) served by the controller and as warranted a breakdown the estimated square feet for turf, shrub and slope areas. 3. Evaluate the list of LMD related amenities including: fencing, playgrounds, bike furniture, etc. We will evaluate and identify the current viability, remaining life span, and replacement value of each amenity. 4. Areas that exhibit poor landscapes, irrigation facilities, or equipment will be documented. Documentation of the LMD assets or sites that are in poor condition will include photographs of those LMD assets or sites indicating general appearance or specific deficiencies. After these steps have been completed, a meeting with City staff will be arranged to review the documentation and electronic files gathered in the field review in order to discuss the preliminary findings and any additional evaluation that may be necessary. Draft and Final LMD Element Inventory Documentation Based on discussions and direction of City staff, Willdan will provide the City with the finalized field data collected for the assets (site and landscape element inventories). The information will be separated by zones. The files will be presented in an Excel spreadsheet format that is capable of linking up asset data with the GIS data information. The spreadsheet data will include lists of assets in a table format (e.g. types, quantities, square footages, etc.), summary tables of assets, and detailed/itemized opinion of probable construction cost estimates for replacement of the assets at the various lifespan timeframes. In addition, the Excel spreadsheets will link up to colored coded maps for each zone along with information pertinent to the LMD inventory. Calculate and Establish Funding Reserve Needs Utilizing the LMD inventory information and GIS data gathered in the field review, as well as knowledge gained through discussions with City staff, Willdan proposes to develop a spreadsheet -based financial planning model that will allow the City to test a variety of "what -if' futures. The model will allow the City to change assumptions related to growth, the capital improvements program, operational programs, and a variety of other planning and financial variables and predict the financial outcome of that scenario. This will be especially useful in testing the affordability of the capital improvement program, allowing the user to turn new projects "on or off' in the model, change the costing with updated information, delay their funding, or look at funding alternatives and their impact on affordability. 'u=res Packet Pg. 43 Mr. Luppens, City of SantaClarita 7,a Revised Scope and Fee for the FinancialAnalysis to Update & Augment the CMD Replacement Reserve Fund & Field Inventory of New Assets December 5, 2014 page 6 Specifically, Willdan will develop a financial model that will allow the City to anticipate the future financial performance of the LMD and each respective zone based on various assumptions. For each zone within the LMD, this model will produce the projected operating results and cash flow for the next 5 and 10 fiscal years for each zone and a summary of the LMD. It will also determine projected revenues, operating and maintenance expenses, capital expenditures and their respective funding sources, fund transfers (if any) and the resulting fund balances for each year of the projection period. This model will also show the summarized activity within the LMD's operating accounts and the projected year-end cash balances for each zone within the LMD. This summarized activity and data can be utilized and easily transferred to the City's existing LMD budget model for establishing the annual assessment budgets for each zone. It is important to note that this model will fully integrate the LMD's CIP and asset listing, as developed in previous tasks, anticipated revenues and expenses, and reserve fund balances, in order to develop a concise summary by fiscal year in a comprehensible format. The model will allow the City to determine the optimum path for balancing the financial health of the LMD against political and other considerations. Using drop-down window functionality, the model will allow the City to view the projected operating results and capital needs at the zone level (micro -view) and at the LMD level (macro -view) and to prioritize asset replacements both separately and collectively. The model will be PC-based using Microsoft Excel and at the completion of the project will be provided to the City. Although it is not anticipated that this budgeting model will be directly linked to the GIS inventory data, it will be structured in a way that updated GIS summary information can be periodically uploaded into the spreadsheet in order to update changes to the LMD elements and the financial plan. The most common way to link Excel to ArcGIS is by using a database join which is accomplished by creating a data field that is present in both the GIS layer's attribute table and the Excel table. For an asset inventory, this would involve establishing an Asset ID in both data files. Once the two tables are joined, the information in the Excel table can be used to perform queries, label features and create symbols in ArcGIS. Any changes made to the Excel table will be updated the next time the map is opened in ArcGIS. This method would not allow the Excel table to be edited in ArcGIS, only in Excel. If editing the Excel data in ArcGIS is desired, the joined layer can be exported to a new GIS layer that would contain both the GIS attributes and the fields from the Excel file. Any kind of spatial operation could then be performed on the data, including calculating XY coordinate values within the desired coordinate system. Excel tables can also be linked to ArcGIS using the Add XY Data command. To use this command, the coordinates of each asset would need to be present in the Excel table. Similar to the database join method, this would not allow the Excel table to be edited in ArcGIS, but the data can be converted to a format that is editable in ArcGIS. The summarized information will be captured in a graphical interface allowing the City to easily change key variables and absorb critical information at a glance. While this work plan considers a 5 to 10 year projection period, the model can easily be revised to accommodate additional years if requested. Upon completion, we will provide in-house staff training on the operation and use of the model. This knowledge will allow City staff to independently and efficiently evaluate the effects of changes in certain factors in future years. Budget Willdan's original cost proposal quoted a fee of $287,000 to complete this engagement over an estimated nine-month time frame. Upon further discussion with the City and in order to meet internal budgeting requirements, the total project cost has revised to $245,000 and will be distributed as follows over three years. Packet Pg. 44 Mr. tuppens, City of Santa Clartta Revised Scope and Fee for the Financial Analysis to Update & Augment the CMD Replacement Reserve Fund & Field Inventory of New Assets December 5, 2074 Page 7 Phase I/Year 1 $ 90,000 Phase II/Year 2 80,000 Phase III/Year 3 75,000 Total Cost $ 245,000 We appreciate this opportunity to provide a revised submittal to the City of Santa Clarita and look forward to beginning this engagement. If you have any questions regarding this submission, please contact Senior Project Manager Jim McGuire or Group Manager Gladys Medina at (951) 587-3500 or via email at imcauire((Dwilldan.com or gmedinaawilldan.com, respectively. Sincerely, WILLDAN FINANCIAL SERVICES Mark J. Risco President and CEO T.a Packet Pg. 45