HomeMy WebLinkAbout2015-04-14 - AGENDA REPORTS - PEDESTRIAN BRIDGE PROJ S1042 (2)Agenda Item: 7 CITY OF SANTA CLARITA q) AGENDA REPORT CONSENT CALENDAR oe CITY MANAGER APPROVAL: DATE: April 14, 2015 SUBJECT: JOHN RUSSELL DRIVE PEDESTRIAN BRIDGE REPLACEMENT, PROJECT S1042 - AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: 1. Approve the plans and specifications for the John Russell Drive Pedestrian Bridge Replacement, Project S1042. 2. Award the construction contract to Toro Enterprises, Inc., in the amount of $429,419. and authorize a contingency in the amount of $42,942, for a total contract amount not to exceed S472�36 1. 3. Appropriate $50,000 from Landscape Maintenance District Zone T-7 (357) Fund Balance into account S 1042357-5 16 1.00 1. 4. Authorize the City Manager or designee to execute all necessary documents, subject to the approval of the City Attorney. BACKGROUND The City of Santa Clarita's (City) Landscape Maintenance District is responsible for the maintenance of all pedestrian bridges connecting the pasco system. This project will replace the existing pedestrian bridge crossing John Russell Drive. This is the last timber bridge to be replaced in the paseo system connecting the north, central, and south Valencia Valley neighborhoods behind Granary Square shopping center, east of McBean Parkway. Due to its deteriorated condition, the existing timber bridge will be replaced with a new prefabricated steel - truss bridge. The substructure and superstructure require replacement as recommended in Los Angeles County's bridge inspection report. The project scope will include removal and replacement of the existing foundhtion, abutments, reconstruction of a portion of each of the approaches, and repair and painting of the existing fencing along the approaches. As part of the Page I Pa Po on Pri F P D Packet P UJ U E I ongoing effort to inform the local residents of construction activity in their community, City staff has contacted the Central Valley Homeowners Association and Valencia Valley Elementary School to inform them the pedestrian bridge crossing John Russell Drive will be replaced this spring. City staff will contact nearby residents and the school and homeowners association prior to the start of construction. An invitation to bid was published three times: January 11. January 2 1, and January 3 1 � 2015� and was noticed on the City's website. Ten bids were submitted to the City and opened by Purchasing on February 10, 2015. The results of the bids are shown below: CompanV DRP Construction Toro Enterprises, Inc. AVA Builders, Inc. PALP, Inc., DBA Excel Paving Co. Monet Construction Inc. Griffith Company MGP Construction Beador Construction Company, Inc. G.B. Cooke, Inc. Future DB International, Inc. Location Bid Amount Encinitas, CA $425,923 Oxnard, CA S429,419 North Hollywood, CA $441,593 Long Beach, CA $453 131 Glendale, CA $467:930 Brea, CA $521,116 Upland, CA $580,522 Corona. CA $590,300 Azusa, CA $596�569 Irvine, CA $694,037 Upon reviewing the bids, City staff determined the bid from the apparent low bidder, DRP Construction, is non-responsive due to failure to list the bridge supplier as directed by the specifications. The apparent low bidder has an unfair advantage to shop for a bridge supplier after the time of bid opening. Therefore, City staff recommends awarding the construction contract to Toro Enterprises, Inc., the second -lowest bidder. Toro Enterprises, Inc., possesses a valid state contractor's license and is in good standing with the Contractors State License Board. The contractor's bid has been reviewed for accuracy and conformance to the contract documents and found to be complete. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Landscape Maintenance District Funds (357) in the amount of $545,000 were previously budgeted in project account Sl 042357-5161.00 LThe requested appropriation of LMD Zone T-7 (357) Funds in the amount of $50,000 creates a total project budget of $595,000. This amount will provide for design expenditures to date and construction contract in the amount not to exceed $472,36 1. ATTACHMENTS Location Map Contract for Toro Enterprises, Inc. (available in the City Clerk's Reading File) Page 2 Packet Pg